Dictionary

Contains all the main tools and phrases of Lean Six Sigma to help you understand the main concept and philosophy and to effectively apply them.
August 29, 2018

Fishbone

“It is a visual team tool used to brainstorm possible root causes to a problem. 6M: man, machine, method, mother nature, materials, measurement Includes repeatedly asking […]
August 29, 2018

Flow – Heijunka

Flow is a time based competitive strategy. The refocusing of attention from cost to time provides organization with immerse competitive advantage. The starting point for most […]
August 29, 2018

FMEA

An acronym for Failure Modes and Effects Analysis. A tool used to assess the risk inherent to a process or product and develop an action plan […]
August 29, 2018

Functional Map

A graphical means to document the functionality of a product or sub- system. It will show the process of the design of the product by showing […]
August 29, 2018

Gemba (walk)

Gemba means “Go and See”. Gemba walk can be used to observe the standard or target against the actual process in real time. The purpose of […]
August 29, 2018

Histogram

Histogram represents the frequency and distribution of data. Trends and outliners can be quickly spotted. Generally the more bell shaped the graph contour is, the more […]
August 29, 2018

Hoshin kanri

“Hoshin means: compass or pointing direction. Kanri means: management or control Hoshin Kanri is 3-5 years strategy; accountability is assigned and execution is monitored on a […]
August 29, 2018

Hypothesis Testing

“Hypothesis tests are embedded in many of the inferential statistics that we use such as t-tests. A “p-value” is the probability of obtaining a result at […]
August 29, 2018

Inventory and Buffers

A method of strategically maintaining inventory levels to service system or customer. Use this tool to determine where and how much inventory to carry and how […]
August 29, 2018

Kaizen

Kaizen is a Japanese word used for continuous improvement. It is one of the main pillar of Lean. Continuous improvement opportunities are endless. It creates a […]
August 29, 2018

Kaizen event

Kaizen events or rapid improvement workshop are usually takes 3-5 days. Should be deployed strategically to improve a specified value stream. The workshop could highlight the […]
August 29, 2018

Kanban

Kanban is a visual management concept to facilitate the flow of work. It reduces inventory through the calculation of quantities based on real end user demand […]